OVI  2005 - 2006
Substation

Location
Bande
Ourense

Architects
Óscar López Martín
Vanesa García-Calvo Rosell

Contributor
Sara Hernández Velasco
gv408arquitectos

Developer
IBERDROLA
Ingeniería y Consultoría S.A.U.

Builder
CEFER

Constructed area
291,26m2

Photograph
Rafael Verdejo

Substation at a wind farm.

The section of this building is raised off the ground, folded to shelter and protect itself from the outside in continuity of form and function. Just one look breaks the shell. A television to the landscape in the break room. The broken anticipated that the rooms on the other side do not follow the geometry of a platform that is independent of its content. A volume inside another volume of panels and carpentry or pieces of translucent glass, outer skin suited to the needs of the interior. The effectiveness of the assembly is the key to something else to build. It's a puzzle and everything fits.